New Homes & Extensions

Plumbing for new builds, additions and extensions, from underground services to final fit-off.

Build the plumbing into the project from the start.

New homes and extensions need plumbing decisions at multiple stages. Water, drainage, fixtures, hot water and rainwater services all need to align with the building plan and construction sequence.

Plumbing delivered in stages as the build progresses.

01

Underground services

Prepare suitable below-ground water and drainage plumbing at the required stage.

02

Rough-in

Install water and waste services before walls and finishes are closed.

03

Wet areas

Plumb bathrooms, kitchens, laundries and other approved wet areas.

04

Hot water plumbing

Prepare suitable plumbing connections for the selected hot water system.

05

Rainwater services

Complete suitable gutter, downpipe and rainwater plumbing within scope.

06

Final fit-off

Install and connect approved fixtures, then test the completed plumbing.

RECURRING ISSUE?

A CCTV inspection can identify damage, roots or a repeated obstruction before unnecessary excavation.

A clear four-step path.

From your first call, we assess the blockage, explain the likely cause, and recommend the right solution before work begins. Our team then clears the drain safely and efficiently, checks the surrounding pipework for underlying issues, and completes a final flow test to make sure everything is working properly before we leave.

REVIEW PLANS

We assess plumbing requirements, fixture schedules and construction stages.

SET OUT SERVICES

Required plumbing is positioned to suit the approved building layout.

ROUGH-IN & COORDINATE

Services are installed and coordinated with other trades.

FIT OFF & TEST

Final fixtures are connected and relevant plumbing is checked before handover.

Common signs your new homes & extensions needs attention.

If something feels different, keeps returning or is getting worse, it is worth having the plumbing checked before the issue becomes more disruptive.

01

New home build

02

Home extension

03

New bathroom

04

Added kitchen

05

Laundry addition

06

Major remodel

THE WORK, SHOWN CLEARLY.

Use real MW Plumbing project photography relevant to this service. Keep the existing two-card proof layout from the Blocked Drains template.

STRAIGHTFORWARD SERVICE, PROPERLY HANDLED.

“Mark and his team have been helping me with a range of plumbing needs across several locations over ten years. They have always been professional, friendly, honest and reasonable.”

RECENT CUSTOMER FEEDBACK · CANBERRA

LOCAL TRADE KNOWLEDGE.
CLEAR PROFESSIONAL STANDARDS.

A blocked drain needs more than a quick guess. MW combines local experience, careful diagnosis and direct communication.

CANBERRA-BASED

Local knowledge and direct owner-led accountability.

LICENSED + INSURED

Qualified plumbing work with the right protections.

CLEAR COMMUNICATION

Practical advice and upfront discussion before work.

QUALITY WORKMANSHIP

Careful execution and a proper final check.

USEFUL ANSWERS BEFORE YOU BOOK.

Questions vary by property. These are the practical starting points we cover most often.

CAN YOU PROVIDE PLUMBING FOR AN ENTIRE NEW HOME?
Yes. We can scope plumbing work across the required construction stages, subject to the project plans, programme and specific services involved.
As early as practical. Early review helps identify service routes, fixture requirements and coordination issues before construction reaches the plumbing stages.
Yes. We can plan and install suitable water and drainage services for new wet areas as part of an extension.
Yes. New construction plumbing depends on sequencing, so we can coordinate our work with the builder and relevant trades.
Yes. We can complete suitable final plumbing fit-off and testing after the required building finishes are ready.

NEXT STEP

READY WHEN
YOU ARE.

Choose the fastest path for the job in front of you. No oversized form and no guessing which department to contact.